Choose a topic to test your knowledge and improve your Software Testing skills
Which two commands you can use to validate a button?
_____ shows the history of changes to specific requirement field on QC Project.
Which of the followings is/are used to see the Requirement Status?
Which is the odd one out?
Using _____ we can check the zooming capability.
How to associate one or more shared object repositories with one or more actions in a test?
Which is/are parts of State Transition Model?
Which of the followings is/are a form of Functional Testing?
If a software testing team is doing testing without Planning and Documentation, then this type of testing is called as, ______ .
Which of the followings is/are best described as Smoke Testing?
Validation is the responsibility of ____
Which tasks should be performed before programmer starts writing the first line of a code?
Defects can be found more easily in ____
Which of the following is / are the types of Acceptance System?
What are the skills that are required by the Agile Tester?
Which of the following is the largest bug producer?
Which of the following is not the objective of CMMI?
The reviewed & approved document is called as a ______ .
A city field in software accepts 3 to 25 alpha characters only. Using BVA technique what will be the possible number of combinations?
Who leads a formal review process?
Exit criteria is determined during ______.
During which activity tester decides if extra test cases are required or not?
Which metric is used to compare the Field Defects with the Test Defects?
During which phase discrepancies are reported as defects?
Risk Mitigation is a Risk _______ Activity. Risk Monitoring is a _____ Activity.
Software risk always involves two characteristics. What are those characteristics?
_____ combines procedures and tools to manage different versions of configuration objects that are created during the software process.
Which of the following is / are types of Software Maintenance?
Independence of module is assessed using two qualitative criteria. What are those criteria?
Which is the most desirable form of cohesion?
What is the first activity in Software Project Planning?
Problem Decomposition in Software Engineering is applied in which area?
____ refers to a different set of tasks ensures that the software that has been built is traceable to Customer Requirements.
White-Box Testing is also known as _____
In a flow graph, node contains a condition and it is characterized by two or more edges emanating from it, is called as ______
Black Box Testing is also known as ___
Equivalence Partitioning comes under which type of Testing?
Percentage mode is used to generate _______.
Global Sampling Rate, Error Handling, Debugging, and Frequency settings is related to _____
Focus Testing comes under ____
Which is not true in case of Unit Testing?
Which of the following is / are not a Iterative Model?
What is the sequence of the Link Defect To Test?
In filter, which logical operator is not accepted?
What is the extension of Action Template in QTP?
_____ will be called through an object, and it will wait for an expected property value of the object.
______ used to add an object to the local object repository.
Product Revision is not related to _____
Nullity of the software can be calculated by ______
What is the extension of Analysis Session File?